Design and construct power and control system building of the contains Scada system ,
Design and construct power and control system building of the contains Scada system, control and MCC panel These pictures explain the work and it’s progress and we are proud that we have finish this project in short time (28 days) while the delivery time for this project was planned to be accomplished within 50 days